Preparation and installation of four multistages Technojet pumps


Preparation and installation of four multistages Technojet pumps 13 stages, 300 HP (700 GPM at 1250 feet of head), being connected to a sump in an underground mine. Technojet pumps all manufactured in our head office in Rouyn-Noranda designed upon the specific needs of our customer.


 
Distributor and
authorized service center
Products tested
before delivery
Emergency Service
24/24 7/7
Delivery
24/72h
  • Benshaw
  • Grundfos
  • Hevvy / Toyo
  • Hose Solutions
  • Josef Emmerich
  • Mudwizard
  • SAER
  • Technojet
  • Technoprocess
  • Technosub
  • Tsurumi
 
Copyright 2017 - technosub.net | Web development - l'Agence secrète | Last update: 11.21.2017