Technosub delivered to Agnico Eagle Meliadine a complete turnkey pump station in a prefabricated building, designed to meet the required flow rate of 130 m3 / h with a total head of 50 m. The pumping station is also designed to withstand extreme weather conditions such as the blizzard. The pumping station will be used to supply water to a portion of the ore processing plant and a camp. Technosub also supplied 75m of insulated and heated suction pipe, as well as a filter that meets fish protection standards in freshwater intakes. Technosub is proud to have worked with local companies to deliver this project.