Park residue pumped by Technojet VT - 4000


From the civil arrangement to the complete installation on site, Technosub was the prime contractor for this project, with several subcontractors to coordinate.

Technosub was responsible for the design, fabrication and installation at the site.

2 VERTICAL PUMPS OF 150HP OPERATED BY VFD
Suspended pumping boxes
No supply line required the pumping chamber acts as a strainer

  • Pumping station are completely designed and manufactured at Rouyn-Noranda
  • The station was installed on a mounted piles to transfer water from the contaminated water pond to the vats of water treatment plant
  • Dicharge of 12 in.
  • Civil and mechanical work done in 21 days (4 weeks)

Where? Preissac, Abitibi-Témiscamingue.



 
Distributor and
authorized service center
Products tested
before delivery
Emergency Service
24/24 7/7
Delivery
24/72h
  • Benshaw
  • Cornell
  • Dragflow
  • Grundfos
  • Mudwizard
  • Niedner
  • Subteck
  • Technojet
  • Technoprocess
  • Technosub
  • Truflo
  • Tsurumi
 
Technosub Group Logo Copyright 2023 © Technosub | Privacy Policy and Personnal Data Management | Last update: 09.21.2023