From the civil arrangement to the complete installation on site, Technosub was the prime contractor for this project, with several subcontractors to coordinate. Technosub was responsible for the design, fabrication and installation at the site. 2 VERTICAL PUMPS OF 150HP OPERATED BY VFD Suspended pumping boxes No supply line required the pumping chamber acts as a strainer Pumping station are completely designed and manufactured at Rouyn-Noranda The station was installed on a mounted piles to transfer water from the contaminated water pond to the vats of water treatment plant Dicharge of 12 in. Civil and mechanical work done in 21 days (4 weeks) Where? Preissac, Abitibi-Témiscamingue. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11