Projects
Deep Well Dewatering
Mandate
A depth challenge, met with expertise
When our client entrusted us with the mission of equipping several shafts reaching up to 175 meters, we knew that precision and safety would be essential.
We supplied five high-performance submersible pumps, designed to withstand the conditions of the mining environment. But our role didn’t stop at delivery: we provided training and on-site supervision for the teams, ensuring installation met the standards.
Thanks to the Altra piping system, renowned for its robustness, each pump was installed with optimal reliability.
Result: secure shaft dewatering, enabling efficient water treatment and uninterrupted operations.
This project illustrates our commitment: turning technical challenges into sustainable, high-performing solutions.
Details
Highlights
Safety and compliance
Training and on-site supervision to guarantee installation meets the strictest standards.
Comprehensive support
From equipment supply to team training, we deliver a turnkey service.
Building trust
Establishing a strong relationship with the client.
Challenges to overcome
Installing a pump in a shaft inclined at 55°
An angle requiring perfect planning and mastery of lifting and anchoring techniques.
Positioning three 260 HP pumps at depths of up to 175 meters
A complex operation to ensure performance.
Deploying a SHD-GC 250 KCMIL cable (2.5 inches) over 205 meters (weight: 3,670 lbs)
A logistical challenge demanding flawless coordination to ensure electrical reliability at great depth.