Projects
Custom Pumping Station – Delivered in 20 Weeks
High capacity. Simplified operation.
An integrated solution designed and manufactured to simplify the operation, handling and maintenance of a high-capacity pumping system.
To meet the requirements of one of our mining sector clients, we had to design and manufacture a complete pumping station combining hydraulic power, piping, instrumentation and the handling equipment required for operation into one cohesive system. At the heart of the solution were a 40-foot High-Cube container, a 10 by 8 foot prefabricated wet well and four 150 HP Tsurumi LH8110 pumps. The system also had to incorporate valves, accessories, a monorail, a hoist and a lifting trolley.
Beyond pumping performance, the team had to approach the system as a complete working environment. Every component had to fit within the available space, remain accessible and support safe equipment handling, all within a particularly tight delivery schedule.
Results
Within 20 weeks, Technosub delivered an integrated pumping station capable of reaching 832 m³/h at 100 m of head with all four pumps operating. The solution combines the essential pumping, process control and equipment handling functions in one complete system.
For the client, this approach reduces the number of interfaces to coordinate among multiple suppliers. The piping, instrumentation, valves, pumps and lifting systems were designed as a whole, supporting a more structured installation and better-planned maintenance.
A Tangible Client Benefit
This project demonstrates Technosub’s ability to turn a complex requirement into a structured, integrated pumping solution ready for deployment. By entrusting design, manufacturing and installation to one team, the client benefits from stronger technical continuity, simplified coordination and a system engineered down to the details of handling and maintenance.
Highlights
Challenges to overcome