Custom Pumping Station – Delivered in 20 Weeks

Côte-Nord, Quebec
Mining
2026
Mandate

High capacity. Simplified operation.

An integrated solution designed and manufactured to simplify the operation, handling and maintenance of a high-capacity pumping system.

To meet the requirements of one of our mining sector clients, we had to design and manufacture a complete pumping station combining hydraulic power, piping, instrumentation and the handling equipment required for operation into one cohesive system. At the heart of the solution were a 40-foot High-Cube container, a 10 by 8 foot prefabricated wet well and four 150 HP Tsurumi LH8110 pumps. The system also had to incorporate valves, accessories, a monorail, a hoist and a lifting trolley.

Beyond pumping performance, the team had to approach the system as a complete working environment. Every component had to fit within the available space, remain accessible and support safe equipment handling, all within a particularly tight delivery schedule.

Results

Within 20 weeks, Technosub delivered an integrated pumping station capable of reaching 832 m³/h at 100 m of head with all four pumps operating. The solution combines the essential pumping, process control and equipment handling functions in one complete system.

For the client, this approach reduces the number of interfaces to coordinate among multiple suppliers. The piping, instrumentation, valves, pumps and lifting systems were designed as a whole, supporting a more structured installation and better-planned maintenance.

A Tangible Client Benefit

This project demonstrates Technosub’s ability to turn a complex requirement into a structured, integrated pumping solution ready for deployment. By entrusting design, manufacturing and installation to one team, the client benefits from stronger technical continuity, simplified coordination and a system engineered down to the details of handling and maintenance.

Details

Highlights

High Capacity
Flow rate of 832 m³/h at 100 m of head.
Custom Solution
Integrated pumping, piping, instrumentation, valves and lifting equipment.
Optimized Design
Equipment housed in a 40-foot High-Cube container.
Simplified Handling
Lifting systems adapted to the container and the pumps.
Specialized Components
Integration of several non-standard components.
Simplified Project Management
Manufacturing and installation coordinated by Technosub.

Challenges to overcome

Complex Piping
Integrate an extensive network within a defined space.
Custom Lifting System
Design a system adapted to the container’s constraints.
SimplifyMaintenance
Plan for wet-well pump handling and maintenance.
Non-Standard Equipment
Integrate several uncommon components into the project.
Technical Integration
Ensure consistency across all system equipment.
Tight Schedule
Deliver the complete project within 20 weeks.
Gallery
Related products
Mine Water
Submersible Pumps

LH Series

Tsurumi
Related projects

Mobile Pumping Station for Acidic Water Environments

2025
Technosub projet station de pompage

Mobile and autonomous booster pumping system

2021
Promotion - Technosub

At your fingertips

Representatives & Branches